Terrace with Iron Railings Waterproofed in White
The terrace's old, stained coating was cleaned and primed, then the floor and low walls were covered with a white waterproof coating.

Step by step
1. Where we started

The old coating had faded and was covered in stains, especially along the low wall.
2. The whole surface

The wear covered the whole terrace, not just a few spots.
3. A clean base

The surface is cleaned so the new material bonds to a sound base.
4. Primer

Primer goes over the whole surface. It binds any remaining dust and helps the waterproof coating stick.
5. Ready for waterproofing

Once the primer is dry, the terrace is ready for the main coat.
6. Low walls first

The coating goes on the low walls and the corners under the railings first, as these are the trickiest spots.
7. The white coat

The white membrane covers the floor and joins up with the low walls, so no joint is left open.
8. The result

One continuous white surface from edge to edge. The white also reflects the sun, so the rooms below heat up less.