Sealing the Edges of a Tiled Terrace
The joint between floor and parapet had opened up under the railings. It was cleaned out and sealed with a white waterproof coating reinforced with fabric.

Step by step
1. An open joint

Where the floor meets the parapet with the railings, the joint had opened and soil and leaves had collected in it.
2. Dirt and rust

Along the parapet the grout had turned black and the railings were rusting at the base.
3. Cleaning

The terrace is cleaned and the joints are cleared of everything that had collected in them.
4. The materials

White waterproofing, a roll of reinforcing fabric and the tools for the job.
5. Sealing the joint

The joint is covered with white waterproofing reinforced with fabric, taken up onto the low wall as well.
6. Along the parapet

The work carries on along the whole length of the parapet, under the railings.
7. The result

A clean terrace, with the joints at the parapets closed to water.