AtticaPro
All projects
Renovations

Full Bathroom Renovation: From a Green Bathtub to a Walk-in Shower

A bathroom with old tiles and a green bathtub was taken back to bare brick and rebuilt from scratch: pipework, render, tiles and fixtures.

Full Bathroom Renovation: From a Green Bathtub to a Walk-in Shower - After
Full Bathroom Renovation: From a Green Bathtub to a Walk-in Shower - Before
BeforeAfter

Drag to compare

Step by step

1. The old bathroom

The bathroom before, with its old tiles and green bathtub

Patterned tiles from another era, a green bathtub and pipework that had done its time.

2. Demolition

Tiles coming off the wall

The tiles, the bathtub and the old render all come off until the brick shows.

3. New pipework

New pipes across the floor and walls

With the walls open, new water and drain pipes go in, routed to where the new fixtures will sit.

4. Floor

The new floor with the shower drain

A new floor sloped toward the drain, so shower water runs away instead of pooling.

5. Rendering

The walls rendered again

The walls are rendered again and made straight, ready for the final coat.

6. A final coat of render

The walls with their final coat of render before tiling

A last coat of render leaves the walls smooth and straight, so the tiles sit properly.

7. Tiles and fixtures

The new wall and floor tiles

Large wall tiles, a dark floor and a feature wall in the shower area.

8. The shower

The shower with its glass panel and heated towel rail

The bathtub became a floor-level shower with a glass panel and a heated towel rail.

Questions this job answers

Have a similar job?

Request Free Estimate
CallWhatsApp